Email: [email protected]   WhatsApp/WeChat: +0086-13801218512
  
Homepage   |   Power Generation   |   Top Spare parts   |   spare parts   |   China OEM Equipment and Spare Parts   |   Project Financing    |   Equipments   |   China Small EPC Contractor   |   Transmission   |   Financing-Ebook   |   Contact Us   |   Used Equipment   |   download   |   sitemaps   |   Project-Equipment-Parts-Enquiry   |   供货商Supplier   |   Exchange Link   |   Breaking News  
Mail List

E-mail:

     上方导航  
       Homepage  
       Power Generation  
       Top Spare parts  
       spare parts  
       China OEM Equipment and Spare Parts  
       Project Financing   
       Equipments  
       China Small EPC Contractor  
       Transmission  
       Financing-Ebook  
       Contact Us  
       Used Equipment  
       download  
       sitemaps  
       Project-Equipment-Parts-Enquiry  
       供货商Supplier  
       Exchange Link  
       Breaking News  
     下方导航  

Diesel Generator Proposal

Power Plant Proposal
Required Information for Power Plant Project design and quotation

Home > HomePage > Spare Parts > Used Power Plant - Used Power Plant GE-LM6000PC

Buyer     Inquiry Basket     Supplier     Register


Used Power Plant GE-LM6000PC


Item NoDescriptionQTYBrandP/NProduct NameDelivery TimeConditionType
369Re: 3 Nos. 45.5 MW each, LM6000PC Gas Turbine Generator Sets. With reference to the above, we have pleasure in offering you herewith 1 No. 136 MW Gas Based Power Plant comprising of 3 Nos. 45.5 MW GE make, Model 7LM6000PC Aero Derivative Gas Turbines Coupled to GE Synchronous Alternators each rating 55230KVA 11KV through ‘LUFKIN�?Gear Box including Controls and Auxiliaries as under: �?The Power Plant was established in the year 2000/2001 and last operated in the year 2017. �?The details of Overhaul/ Maintenance and Special Tools/ Spares are as below: Overhaul/ Maintenance: 1. Bore scope inspection of LM6000 Engine is carried out every 4000 FEH (Fired Engine Hours). 2. For Engines operating on liquid fuel the HSIR (Hot Section Inspection and Replacement) is carried out every 12,500 FEH. In this the process the Combustor and the High Pressure Turbine (HPTR) is refurbished / replaced. 3. In case of Gas operation, the HSIR is done once in 25,000 FEH. 4. Engine Major Overhaul (MOH) is carried out once in 50,000 FEH. Since the average Fired Engine Hours are in the range of 35000 Hrs, none of the gas turbines are due for major overhaul. 5. Overhauling of the turbines till date were carried by Original Equipment Manufacturer only. Details of Special Tools/ Spares Available for Gas Turbines: 1. LM6000 Maintenance Dolly �?2 Nos. 2. Turbine shipping container �?2 Nos. 3. Level II maintenance Tools �?1 set 4. LPT dolly �?1 No. 5. Spare Combustor �?2 Sets 6. Spare HP Turbine - 1 set �?We are enclosing herewith complete Technical Parameters of Main Equipment, Controls and Auxiliaries etc. �?The Main Fuel was Naptha and High Speed Diesel was used for start up. Continuous use on HSD is also permitted. The Plant can also run on Gas with minor modification and separate centrifuge are available for treating both Naphtha as well as HSD used for firing in the Gas Turbine. �?Gas Turbine Control System is NETCON -5000 supplied by WOODWARD-USA. �?Daily Gas requirement for the Project at full load is about 0.85 MMSCMD and daily Naphtha requirement at full load 650 MT.Used Power PlantGE-LM6000PCused power plant, equipment, spare parts, prior to sales, or just as information, not accurate or not for specific plant only.
Pubdate: 2022/4/26 16:56:23


Click add item to inquiry basket      Click Copy Shared LinksInquiry Basket

Pageviews: 1



Statement: Any reference to the OEM part number or other OEM information is for the purpose of identification only and does not imply that the part was manufactured by the Original Equipment Manufacturer.

All the brands and trademarks in the whole domain of the website belong to their own owners and does not mean that we are their authorized partner or dealer. All the information in this website is only for reference, we do not assure its accuracy.

This statement supersedes all other claims and statements on all pages, files, pics and information within this whole web domain.

Copyright©2006-2019 Leda Greenpower Beijing ICP Reg. No: 10010978.   Fax:0086-10-84161062  E-mail: [email protected]

JingGongAnBeiAn 11010802035914 Hao