296 | Condensing Steam Turbine- Generator Set, producing
44.5 MWe @ 11 kV
Year Commissioned:
Year Retired: Condition: Operating Hours:
Status: 2002
2013
Very Good
~70,000
On Foundation
Important Disclaimer - Although the statements and technical information contained herein are believed to be materially accurate as of the date hereof, no representation or warranty is given as to the accuracy of any of the information provided. Certain information contained herein is based on information from sources considered to be reliable. The information referred to herein is subject to change
STEAM TURBINE
Manufacturer: Model Number: Configuration:
Rated Power: Rated Inlet Flow:
Rated Inlet Pressure: Rated Inlet Temp.: 1st Bleed (process):
2nd Bleed (deaerator): 2rd Bleed (pre-heater): Exhaust Pressure:
Rated Speed:
Nuovo Pignone HNK 50/3.2
1 impulse stage
62 reaction stages
44,500 kW
131,400 kg/h
110 bara
510 ºC
20 bara / 315 C
3 bara / 135 C
0.9 bara / 95 C
0.08 bara 3,000 rpm
Important Disclaimer - Although the statements and technical information contained herein are believed to be materially accurate as of the date hereof, no representation or warranty is given as to the accuracy of any of the information provided. Certain information contained herein is based on information from sources considered to be reliable. The information referred to herein is subject to change
GENERATOR
Manufacturer:
Rated Apparent Power:
Power Factor: Active Power: Rated Voltage: Current: Phases:
Rated Speed:
Frequency:
Jeumont Industrie 51,500 kVA
0.8
41,200 kW
11,000 V ± 5%
2,703 A
3
3,000 rpm
50 Hz
Important Disclaimer - Although the statements and technical information contained herein are believed to be materially accurate as of the date hereof, no representation or warranty is given as to the accuracy of any of the information provided. Certain information contained herein is based on information from sources considered to be reliable. The information referred to herein is subject to change
History of Equipment:
Commissioned: November 2002 Shutdown: 31st December 2013
~ 70,000 service hours
Life-time Maintenance by OEM Recent Plant Overhaul (August 2013)
Fully operable condition, under long term preservation
Important Disclaimer - Although the statements and technical information contained herein are believed to be materially accurate as of the date hereof, no representation or warranty is given as to the accuracy of any of the information provided. Certain information contained herein is based on information from sources considered to be reliable. The information referred to herein is subject to change | | Used Power Plant | Nuovo Pignone-HNK 50/3.2 | used power plant, equipment, spare parts, prior to sales, or just as information, not accurate or not for specific plant only. | | | |