260 | We have one complete Westinghouse 191 turbine only, we removed from Morehead NC. Please see attached boroscope report. We are asking $for complete turbine. Lee Units #1, and Morehead #1 are Westinghouse 191G Turbine Generators rated at 16 MW each. Both turbines were peaking units which ran on distillate oil with Air Cooled Generators. The turbines are housed on Removable Braden steel buildings. The Morehead unit was a stand alone emergency unit at an 110KV Transmission Switch Yard. Both units are black start capable with diesel generators within the turbine building. The latest borescope inspection results, performed prior to shut down in 2011 are available upon request. | | Used Power Plant | Westinghouse-W191G | used power plant, equipment, spare parts, prior to sales, or just as information, not accurate or not for specific plant only. | | | |