Email: [email protected]   WhatsApp/WeChat: +0086-13801218512
  
Homepage   |   Power Generation   |   Top Spare parts   |   spare parts   |   China OEM Equipment and Spare Parts   |   Project Financing    |   Equipments   |   China Small EPC Contractor   |   Transmission   |   Financing-Ebook   |   Contact Us   |   Used Equipment   |   download   |   sitemaps   |   Project-Equipment-Parts-Enquiry   |   供货商Supplier   |   Exchange Link   |   Breaking News  
Mail List

E-mail:

     上方导航  
       Homepage  
       Power Generation  
       Top Spare parts  
       spare parts  
       China OEM Equipment and Spare Parts  
       Project Financing   
       Equipments  
       China Small EPC Contractor  
       Transmission  
       Financing-Ebook  
       Contact Us  
       Used Equipment  
       download  
       sitemaps  
       Project-Equipment-Parts-Enquiry  
       供货商Supplier  
       Exchange Link  
       Breaking News  
     下方导航  

Diesel Generator Proposal

Power Plant Proposal
Required Information for Power Plant Project design and quotation

Home > HomePage > Spare Parts > Used Power Plant - Used Power Plant Siemens-SGT 200

Buyer     Inquiry Basket     Supplier     Register


Used Power Plant Siemens-SGT 200


Item NoDescriptionQTYBrandP/NProduct NameDelivery TimeConditionType
252Date: July 2019 Quotation: SGT200-2S Customer Ref: Email Request Tornado 7.68mw Zero Houred GG suitable for 48,000hours. The following is the current configuration and new zero houred condition of the fully overhauled by OEM Workshop for the equipment under offer and is subject to remaining unsold at the time of your order. GG Build spec: -Inlet bearing support casing oCoated with SermeTel 5380DP oVibration monitoring probes to BN3300 (ATEX) standard -LP/HP Compressor stator oIGV blades and mechanisms fully overhauled and coated with SermeTel 5380DPanti-corrosion coating oCompressor stator blading stages through to stage 5 coated with SermeTel 5380DPanti-corrosion coating oCompressor stator blading stage 6 to exit stage are super polished oLP/HP casings coated with SermeTel 5380DP anti-corrosion coating. -Centre casing oCasing coated with SermeTel 5380DP anti-corrosion coating. oVibration monitoring probes to BN3300 (ATEX) standard oCT bearing modified to tilt pad configuration -Combustion system oFlame Tube fully overhauled and Chrome Carbide Hard Coated on interfaces oTransition ducts fully overhauled and Chrome Carbide Hard Coated on interfaces -CT 1 Stator oCT Carrier ring fully overhauled to OEM specification oCT1 Nozzles fully overhauled and Sermaloy J coated -CT 2 Stator oStator segments fully overhauled and Sermaloy J coated. oNew stage 1 & 2 track seals oNew inter-stage seal. Technical & Commercial Information SGT 200 - Torn Page 2 of 3 ado [New Customer] PITech Ltd -Gas Generator Rotor Assembly oDisc pack, Inlet, Exit & Intermediate Stub Shafts fully overhauled and coated withSermeTel 5380DP anti-corrosion coating oCompressor Rotor Blading/Spacers fully overhauled, stages 1 to 5 coated withSermeTel 5380DP/Sermaflow coating, stages 6 to exit Super Polished oGlitching tracks machine polished oCT1 (Mar-M) new rotor blades coated with Sermaloy 1592 and suitable for 24,000hrs full operation oCT2 (Mar-M) rotor blades coated with Sermaloy 1592 installed and suitable for24,000 hrs full operation. oGG Rotor assembly balanced to OEM procedures Gas Generator Rebuild oBuilt to RT 7.68mw standard, Dual Fuel •Blow Off Valves •Excludes liquid fuel pig piping, igniters and IGV ram as customer to use on baseexisting parts for these items. Gas Generator has operated in a European environment and have been fully maintained and OEM overhauled after completing 24,000hr of operation and throughout their operational life. Price in Sterling British Pounds (GBP): Direct Supply - £ EXW Incoterms 2010 - Price is based on EXW incoterms 2010 our workshop Jebel Ali Free Zone ,Dubai The core will hold a full 12 Month warranty from date of first operation or 18 months from delivery, whichever the sooner. The core has already been tested and test report can be provided once a detail contract is formulated for purchase. Payment is 50% with order and 50% prior to collection from workshop in Jebel Ali Free Zone .Dubai UAE Shipment can be ready for collection from Workshop within 7 days from receipt of downpayment. Prices is valid for acceptance within 30 days of this proposal and subject to remaining unsold Technical & Commercial Information Page 3 of 3 SGT 200 - TornadoUsed Power PlantSiemens-SGT 200used power plant, equipment, spare parts, prior to sales, or just as information, not accurate or not for specific plant only.
Pubdate: 2022/4/26 16:56:22


Click add item to inquiry basket      Click Copy Shared LinksInquiry Basket

Pageviews: 2



Statement: Any reference to the OEM part number or other OEM information is for the purpose of identification only and does not imply that the part was manufactured by the Original Equipment Manufacturer.

All the brands and trademarks in the whole domain of the website belong to their own owners and does not mean that we are their authorized partner or dealer. All the information in this website is only for reference, we do not assure its accuracy.

This statement supersedes all other claims and statements on all pages, files, pics and information within this whole web domain.

Copyright©2006-2019 Leda Greenpower Beijing ICP Reg. No: 10010978.   Fax:0086-10-84161062  E-mail: [email protected]

JingGongAnBeiAn 11010802035914 Hao