5 | Let me send you detail of Used 800MW Gas Power Plant.
Thank you.
Used 800MW Combined Gas Power Plant
Gas turbine 100MW x5+Steam turbine 150MW x2=800MW
HZ: 60hz
Fuel : LNG
Build in:1995
Expire Date : The middle of 2013
(Gas Turbines)
Manufacturer : WESTINGHOUSE
Model Name : W501D5
Type : Axial Flow
Power Output : 100,000 kW(100MW)
Stages : 4 stage
Inlet Temp. : 1093 �?Exhaust Temp. : 530 �?Exhaust Flow : 1313272 kg/h
TAC Temp. : 15�?Speed Governor : DEHC
-Starter System
Type : Electric Motor
Capacity : 1530 kW
Quantity : 1 ea
-Combustor
Type : Can-Annular
Quantity : 14 ea
-Compressor
Type : Axial Flow
Air Mass Flow : 358 N�?min
Inlet Temp. : 15�?Pressure Ratio : 14:01
Outlet Pressure : 14.462 kg/�?Stages : 19 stage
Outlet Temp. : 389 �?(Gas Turbine Generators)
Manufacturer : WESTINGHOUSE
Type : OAC(Open-Air-Cooled)
Rated Power : 129(143) MW(MVA)
Power Factor/ short-circuit ratio : 90%/0.695
Frequency : 60Hz/2pole
Speed : 3600 RPM
Rated Voltage/Current : 13.8 kV/5731 A
Insulation Class : F
-Exciter
Speed : 3600 RPM
Exciter Type : PMG
Rated Voltage/Current 325 V/1006 A
Protection Devices : 87G, 59GN, 40,32,46, 51V, 60,25
Neutral Grounding : NGR
Bus Bar : IPB(3phases)
Rotation Direction : CW(Viewed Form Exciter end)
(Steam Turbine)
Manufacturer : Hitachi(Japan)
Year:1971
Overhaul year:1997
Type : TCDF Reheat Condensing 23
Power Output : 150,000 kW
Rotor Speed : 3,600 RPM
Number of stage : HP 6 / IP 7 / LP 5
Main Steam Pressure : 100.1 kg/
Main Steam Inlet Temperature : 498.2
Reheat Steam Inlet Pressure : 34.4 kg/
Reheat Steam Inlet Temperature : 353.9
Reheat Steam Outlet Pressure : 31.7 kg/
Reheat Steam Outlet Temperature : 501.5
Exhaust Pressure : 38 mmHg(a)
Speed Governor : Electro-Hydraulic Governor
(Steam turbine Generator)
Type : TFLH
Rated Power : 150MW(MVA)
Power Factor : 85%/0.58
Frequency : 60Hz/2pole
Speed : 3600 RPM
Rated Voltage/Current 17 kv/6,521 A
Insulation Class : B
-Exciter
Speed : 3600 RPM
Exciter Type : Rotary Rectifier
Rated Voltage/Current : 284 V/1,060 A
Protection Devices : 87G, 64G, 59F, 40F, 46F, 32, 21G
Neutral Grounding : Grounding Transformer
Bus Bar : IPB(3phase)
(Operation Period)
Gas Turbine #2. 37,013hours(1996.1~2013.6)
Gas Turbine #3. 39,800hours(1996.1~2013.6)
Gas Turbine #4. 41,541hours(1996.7~2013.6)
Gas Turbine #5 41,819hours(1996.7~2013.6)
Gas Turbine #6. 40,524hours(1996.7~2013.6)
(Operation hours from overhaul to stop)
Gas turbine #2: 16,611 hours
Gas turbine #3: 17,098 hours
Gas turbine #4: 15,686 hours
Gas turbine #5: 17,978 hours
Gas turbine #6: 16,921 hours
Steam Turbine #1, 34,998hours(1997.7~2013.6)
Steam Turbine #2, 37,723hours(1997.7~2013.6) | | Used Power Plant | WESTINGHOUSE-W501D5 | used power plant, equipment, spare parts, prior to sales, or just as information, not accurate or not for specific plant only. | | | |