Email: [email protected]   WhatsApp/WeChat: +0086-13801218512
  
Homepage   |   Power Generation   |   Top Spare parts   |   spare parts   |   China OEM Equipment and Spare Parts   |   Project Financing    |   Equipments   |   China Small EPC Contractor   |   Transmission   |   Financing-Ebook   |   Contact Us   |   Used Equipment   |   download   |   sitemaps   |   Project-Equipment-Parts-Enquiry   |   供货商Supplier   |   Exchange Link   |   Breaking News  
Mail List

E-mail:

     上方导航  
       Homepage  
       Power Generation  
       Top Spare parts  
       spare parts  
       China OEM Equipment and Spare Parts  
       Project Financing   
       Equipments  
       China Small EPC Contractor  
       Transmission  
       Financing-Ebook  
       Contact Us  
       Used Equipment  
       download  
       sitemaps  
       Project-Equipment-Parts-Enquiry  
       供货商Supplier  
       Exchange Link  
       Breaking News  
     下方导航  

Diesel Generator Proposal

Power Plant Proposal
Required Information for Power Plant Project design and quotation

Home > HomePage > Project > New Project > Solid Fuel Power Generation Industry - 2 × 25MW Pulverized Coal Turbine Generator Set Plan

Buyer     Inquiry Basket     Supplier     Register


2 × 25MW Pulverized Coal Turbine Generator Set Plan


Industry:Solid Fuel Power Generation Industry
Project Name:2 × 25MW Pulverized Coal Turbine Generator Set Plan
Main Equipment Brand:China Brand
Main Equipment Model:25MW, 50Hz, 11kV
Origin of Product:China
Project Progress:新项�?New Project
Project Country:
Project Capacity:
Summary Briefs
on the Project:
Project Role:
Bidding Or Negotiation:
Project Funding: 
Payment Terms:
Project Type:
Project Start And End Time: - 
Name Of Project Partners:
File Link:NO_File

 

2 × 25MW Pulverized Coal Turbine Generator Set Plan

 


 

I. Overview

Project Name:

Project Introduction: The project involves a 2×25MW coal-fired power plant with a voltage of 11/66kV, connected to the grid.

Supplier Responsibility: The supplier is responsible for the design and the conventional layout of the power plant, including the boiler room, turbine hall, and water treatment plant. The scope includes the supply, installation, and commissioning of all power generation equipment within the boiler room, turbine hall, and water treatment plant. It also covers the supply and installation of process pipelines and cables connecting the boiler room, turbine hall, and water treatment plant, with the construction of the circulating water pipeline up to a single-direction 25m outside the turbine hall. The electricity generated is transmitted to the 11kV outgoing cabinet via outgoing cables, and the 11kV high-voltage room is equipped with a grid connection cabinet. The low-voltage distribution is set up in the plant's transformer low-voltage distribution room. A 66kV step-up substation is also included.

Owner Responsibility: The owner is responsible for civil engineering, secondary grouting, fire protection engineering, cranes, electric hoists, lighting, fiberglass cooling towers, lightning protection and grounding, water supply and drainage systems, and heating, ventilation, and air conditioning. The owner must also provide the emergency oil discharge pool, oil, water, and steam testing equipment, and all customs-regulated flammable, explosive, toxic, and hazardous materials such as welding gases, paint, acetone, grease, and resins, as well as detection equipment for invasive species like sand and soil.

II. Main Technical Indicators

·       Annual utilization hours are calculated at 7440h, with daily utilization hours at 24h.

·       The boiler evaporation rate is 130t/h, and coal consumption is 28.77t/h.

·       Power generation capacity: 25MW × 2 = 50MW at 11kV, 50Hz.

·       Annual electricity generation: 3.0 × 10^8 kWh.

·       Annual coal consumption: 50 × 10^4 t.

·       Standard coal consumption for power generation: 0.424kg/kWh.

·       Standard coal consumption for power supply: 0.451kg/kWh.

·       Overall plant thermal efficiency: 90%.

·       Site area: 50,000m^2.

 

III. Plan and Investment Amount

 

 

 


No.

Name

Model/Specification

Unit

Quantity

Price (USD)

Remarks

1

Coal Mine

Annual supply: 500,000t/year.

-

-

-

Responsible by the owner

2

Coal Transportation

-

-

-

-

Responsible by the owner

3

Equipment

-

-

-

-

-


1. Boiler

Evaporation 150t/h, pressure 3.8Mpa, superheated steam temperature 450�?/span>

Each

2


-


2. Turbine Generator Set

25MW, 50Hz, 11kV

Each

2


-


3. Circulating Water System

-

Each

1


-


4. Water Treatment System

10t/h

Each

1


-


5. High Voltage Power Distribution and Control Protection

-

Each

1


-


6. Low Voltage Power Distribution for Plant Use

-

Each

1


-


7. Turbine Thermal Instrument and Control Cabinet

-

Each

1


-


8. Mechanical and Electrical Installation Materials, Consumables

-

Each

2


-


9. Remote Monitoring System

-

Each

1


-


10. Step-Up Station 11/66kv

40MVA 11/66KV

Each

2


-


Subtotal FOB (Shanghai)

-

-

-


-








4

Site

-

-

-

-

Responsible by the owner


Coal Powder Site

5000m²

-

-

-

-


Equipment Installation Site

35000m²

-

-

-

-


Ash Pile Site

10000m²

-

-

-

-

5

Flue Gas Treatment

-

-

-

-

Responsible by the owner


Exhaust Stack

50-120m

-

-

-

-


Desulfurization and Denitrification Treatment

-

-

-

-

-

6

Power Transmission Line System

-

-

-

-

Responsible by the owner

7

Transportation Costs

-

-

-

-

-


Sea Freight: China - Togo

-

-

1


-


Land Transportation: Togo - Power Plant Site

-

-

1


Responsible by the owner

8

Comprehensive Commissioning Fee for the Project

-

-

-


-

Total

EPC

-

-

-


-



LC_Guid:314157F2351FCC4DAC3BB5E5153DE9D5
Pubdate: 2024/7/19 19:44:19


Click add item to inquiry basket      Click Copy Shared LinksInquiry Basket

Pageviews: 2



Statement: Any reference to the OEM part number or other OEM information is for the purpose of identification only and does not imply that the part was manufactured by the Original Equipment Manufacturer.

All the brands and trademarks in the whole domain of the website belong to their own owners and does not mean that we are their authorized partner or dealer. All the information in this website is only for reference, we do not assure its accuracy.

This statement supersedes all other claims and statements on all pages, files, pics and information within this whole web domain.

Copyright©2006-2019 Leda Greenpower Beijing ICP Reg. No: 10010978.   Fax:0086-10-84161062  E-mail: [email protected]

JingGongWangAnBei: 11010802035914 Hao