Industry: | Fluid Power Generation Industry | Project Name: | investment of HFO or other type of power plant projects by our EPC | Main Equipment Brand: | Chinese | Main Equipment Model: | Chinese | Origin of Product: | | Project Progress: | 新项�?New Project | Project Country: | | Project Capacity: | | Summary Briefs on the Project: | | Project Role: | | Bidding Or Negotiation: | | Project Funding: | | Payment Terms: | | Project Type: | | Project Start And End Time: | - | Name Of Project Partners: | | File Link: | NO_File |
Here are the basic topics to be discussed or collected for our EPC when considering investment of HFO or other type of power plant projects
For on-site construction of Power stations to sale the electricity, the following issues needs to confirm: 1. Supply interface: 1.1 The supplier provides the Generating Set, a full set of auxiliary machines and installation materials for the Generating Set, and provide the guides for the installation; 1.2 The buyer provides the basement for the Gen-set, and provide all the building construction for the whole Power stations, and provide port clearance, on-site transportation, lifting, equipment installation, etc. 2. Operation and maintenance interface: 2.1 The supplier provide the operation and maintenance of the power station, and provide spare parts and tools. 2.2 The buyer provides fuel and lubricating oil. 3. Electricity price: 3.1 The buyer needs to guarantee the minimum monthly electricity consumption and minimum consumption years of the Power plant. This is for the supplier to calculate equipment investment and electricity price. 3.2 The buyer shall also provide the local fuel price and local electricity market price. 4. Guarantee: 4.1 The buyer shall guarantee the safety and living supply of the operation & maintenance personnel, and the safety of the Power stations and equipment. 4.2 The buyer needs guarantee the equipment investment of the supplier, the guarantee method is advancing payment for the electricity, or other guarantee methods mutually agreed by both buyer and supplier. 5. Equipment disposal: 5.1 The buyer shall guarantee to repurchase the power station equipment when the power station operating for a certain period of time or after the expiration of the power supply contract. The repurchase price shall be mutually agreed by both buyer and supplier.
LC_Guid: |