Name of Used or Surplus Equipment/Project: | 13 units of New Siemens steam Turbine: SST400 | Brand name of Equipment: | Siemens | P/N of Equipment: | SST400 | Industry: | Solid Fuel Power Generation Industry | Summary Briefs on the equipment: | | Origin of Main Product: | | Year of Production of Main Equipment: | | Current Country located: | | Original Packing: | | Warranty: | | Documents: | | Dismantled or on site: | | Can be Test Run or Not: | | Year of Shutdown: | | Year of Overhaul: | | Total Operation Hours: | | O&M log: | | Current Condition: | | Dismantling, packing transportation Serviece: | | Refurbishment Services: | | Site installation and commissioning or Supervision: | | Role: | | Already Sold or not: | | Time of first Sold: | | rough budget or contract value in USD: | | Payment Terms: | | File Link: | NO_File |
new Siemens steam turbine:SST400,power:30mw,voltage:10.5kv/50hz,hours:Zero,year:2015 with Alternator:SGen5-100A-4P,Power:38MVA,voltage:10.5kv/50hz(new ,year:2015,hours:Zero) fuel:Biomass�?/span>without boilers they still are in boxes,not assembling ,warehouse 13 units are available Let me know if your have an interesting in them,send you details Unfortunately the seller would not receive LC for payment They request 40% by TT and 60% by LC If this condition will be acceptable, I will start discussion with seller Sorry another issue is that it will not be possible to get offer directly from owner , Owner is kind of insurance company and not directly involved in sales of these units as where as it is, without warranty. Please advise your comments on this I am afraid seller is not in a position to provide EPC services, which can be talked after sales of equipments.
|