Offer for 26MW 3SETS 18V3240 8.75MW HFO Gen-Sets |
No. | Item | Qty | Unit | Price (USD) | Total(USD�?/td> | Remark1 |
A1 | MAN 8750KW/11KV/50HZ HFO generating set. (Engines Made in around 2011-2103, stocked in house as new ones, but alternators are of 60hz, so new alternators will be configured as new generator sets.) | 3 | set |
|
|
|
A1.1-A1.5 | Include: Diesel engine柴油机Alternator发电机Common base frame共同底座Flexible coupling联轴器Control ect. | 3 | set |
|
|
|
A1.6 | FLEXIBLE CONNECTIONS Flexible hoses PLATFORMS Prefabricated platform for engine and generator | 3 | set |
|
|
|
A1.7 A1.8 | PLATFORMS Prefabricated platform for engine and generator | 3 | set |
|
|
|
A2 | MECHANICAL AUXILIARY SYSTEM |
|
|
|
|
|
A2.1 | FUEL SYSTEM TANK :LIGHT FUEL OIL SYSTEM TANK AND HEAVY FUEL OIL SYSTEM TANK | 1 | LOT |
|
|
|
A2.2 | LUBE OIL SYSTEM TANK:ENGINE LUBE OIL SYSTEM TANK AND PLANT LUBE OIL SYSTEM TANK | 1 | LOT |
|
|
|
A2.3 | STARTING AIR SYSTEM AND CONTROL AIR SYSTEM | 2 | set |
|
|
|
A2.4 | COOLING SYSTEM :ENGINE COOLING SYSTEM | 3 | set |
|
|
|
A2.4.1 | Soft Water treatment system | 1 | set |
|
|
|
A2.4.2 | Waste liquid (water and oil) treatment system and waste solid treatment (incineration) system:Integrated oil and water separation unit, and incinerator | 1 | set |
|
|
|
A2.5 | CHARGER AIR SYSTEM | 3 | set |
|
|
|
A2.6 | EXHAUST GAS SYSTEM | 3 | set |
|
|
|
A2.6.1 | Exhaust boiler LFL-800-0.7 800kg/7bar | 3 | set |
|
|
|
A2.7 | MECHANICAL STRUCTURES AND STEEL STRUCTURES | 3 | set |
|
|
|
A2.8 | Install the required connection pipes, flanges, seals, valves, screws, nuts, insulation materials and other materials. | 3 | set |
|
|
|
A3 | ELECTRIC SYSTEMS |
|
|
|
|
|
A3.1 | MAIN SWITCHGEAR | 3 | set |
|
|
|
A3.2 | STATION SERVICE SYSTEM | 1 | set |
|
|
|
A3.3 | DC �?SYSTEM | 1 | set |
|
|
|
A3.4 | EARTHING | 1 | set |
|
|
|
|
|
|
|
|
|
|
A4 | CONTROL AND INSTRUMENTATION |
|
|
|
|
|
A4.4 | DCS �?SYSTEM | 1 | set |
|
|
|
A4.5 | CONTROL PANELS | 1 | set |
|
|
|
A4.6 | CABLES / ACCESSORIES /Control & instrumentation cables ect.Electrical materials are required for installation | 3 | set |
|
|
|
A4.7 | TOOLS |
|
|
|
|
|
| Tools for turbocharger Fuel and lube oil testing kit . Tools for separator. | 1 | set |
|
| Quoted price included |
A4.8. | Random spear parts and tools |
|
|
|
|
|
A4.8.1 | Random Spare parts for engine / turbocharger/separator | 1 | set |
|
| Quoted price included |
A4.8.2 | Random tool | 1 | set |
|
| Quoted price included |
C6/C6.5 | DOCUMENTS :USER MANUAL | 1 | set |
|
| Quoted price included |
| sub-total 小计 |
|
|
|
|
|
II | Provide technical guidance: 1650usd/people,day*4people*80day | 1 | lot |
|
|
|
|
|
|
|
|
|
|
F1 | SEA COST 海运�?dubai port) | 3 | set |
|
|
|
F2 | 吊装,码头,仓库和短途运输费(To shanghai port) | 3 | set |
|
|
|
F3 | Power station design fee, building, foundation. Road, civil construction, crane, lighting, fire protection, sea transportation, local land transportation, oil and water storage tank, equipment installation, mechanical/electrical/thermal insulation materials/paint and other materials required for installation and transaction expenses shall be borne by the Buyer.电站设计�?厂房,基础.道路,土建,吊机,照明,消防,海运,就地陆运,油水储罐,设备安装,安装所��机械/电气/保温隔热材料/油漆等材料及往��费用由买方承�? | 1 | lot |
|
|
|
| TATOAL TO SHANGHAI PORT (Usd) |
|
|
|
|
|
|
|
|
|
|
|
|
Notes: |
|
|
|
|
|
|
| 1. All prices base on EXW SHANGHAI PORT in USD |
|
|
| 2.Quality guaranty: Provide full warranty within one year from the date of delivery or 2000 operating hours, whichever comes first. |
|
| 3.Date of delivery: 9-10 months after receipt of advance payment. Delivery Terms: EXW Shanghai port. |
|
|
| 4. Payment: 50 percent advance payment, 50 percent before shipment. |
|
|
| 5. Valid date for the offer: before . 30-Oct-2023 |
|
|
| 6. The offer is for equioment inside the power plant only (referring to the quoted.). All civil work and fuel tanks should be taken out by customer. |
|
| 7. Installation guide and test: |
|
|
|
|
|
| a. The costs for traveling between China and customer, medical and isolation. lodging and food shall be borne by customer.往��中国和工地的旅差费用,医疗和隔离费用。住宿费和伙食费由客人负�?/td> |
|
| b. personnel cost: 1650usd/people,day*4people |
|
| 8.Power station design fee, building, foundation. Road, civil construction, crane, lighting, fire protection, sea transportation, local land transportation, oil and water storage tank, equipment installation, mechanical/electrical/thermal insulation materials/paint and other materials required for installation and transaction expenses shall be borne by the Buyer.电站设计�?厂房,基础.道路,土建,吊机,照明,消防,海运,就地陆运,油水储罐,设备安装,安装所��机械/电气/保温隔热材料/油漆等材料及往��费用由买方承�? |
|