Name of Used or Surplus Equipment/Project: | Used 34MW OCGT gas turbine power station of SGT-700 for sale | Brand name of Equipment: | Siemens | P/N of Equipment: | SGT-700 | Industry: | Gas Power Generation Industry | Summary Briefs on the equipment: | | Origin of Main Product: | | Year of Production of Main Equipment: | 2011 | Current Country located: | 日本韩国 apan/Korea | Original Packing: | | Warranty: | | Documents: | | Dismantled or on site: | | Can be Test Run or Not: | | Year of Shutdown: | 2018 | Year of Overhaul: | | Total Operation Hours: | 650 | O&M log: | | Current Condition: | | Dismantling, packing transportation Serviece: | | Refurbishment Services: | | Site installation and commissioning or Supervision: | | Role: | | Already Sold or not: | | Time of first Sold: | | rough budget or contract value in USD: | | Payment Terms: | | File Link: | 1. IPP_2.2_34MW GT_Technical Specifications_20190821_墨消し済�?pdf |
We have been assisting the shipper of subject equipment and materials for re-construction of 34MW OCGT gas turbine power station that was dismantled in 2019 at Niigata Japan. The asset owner gave their exclusive sale right to the above mentioned shipper. We succeeded to export another set of equipment and materials for re-construction of 81MW OCGT gas turbine power station dismantled in 2019 last December 2022 under same business structure. 2) Technical specifications of this 34MW OCGT gas turbine station is attached hereto. 3) Current conditions of these equipment and materials is shown in the photos of list of equipment attached hereto. 4) Asking price is USDmillion on FOB Niigata Japan. Should you need further information please ask us freely. I look forward to have your cooperation to sell this complete set of gas turbine power station successfully in the shortest possible time frame. 1. General The gas turbine plant (herein after referred to as the Plant) was owned by Tohoku Electric Power Company and commissioned in the premises of Niigata Power Station of Tohoku Electric Power Company in Niigata, Japan in October 2011. Since then the Plant has been operated by Tohoku Electric Power Company until 2017. The total accumulated operation hours and ignition time of the Plant is around 650 hours. In 2018, the Plant was determined to be sold by Tohoku Electric Power Company and it was determined to be disassembled for export in the overseas in a form of scrap and build works. At present as of January 2019, the Plant has been already disassembled and stored at Niigata to be ready for exportation upon receiving order from the Purchaser. 2. Outline of the Plant The Plant is composed of following main equipment of which outline of respective equipment is as follows: A. Gas Turbine Unit 1) Rated output power : 34 MW (Atmospheric temperature: -1oC) 2) Type of gas turbine : Open cycle gas turbine for continuous operation 3) Manufacturer of gas turbine : Siemens of Germany 4) Model number of gas turbine : STG-700 5) Type of turbine : 3 stages 6) Combustion temperature : 1,260oC Class 7) Exhaust gas temperature : 568oC 8) Exhaust gas volume : 335,000 m3N/h 9) Exhaust mass flow : 95.0kg/s 10) Electrical efficiency : 38.2% 11) Drive Shaft Speed : 3,250-6,500 rpm 12) Number of combustors : 10 combustors 13) Air compressor : 17 stages 14) Type of fuel : City gas (LNG) B. Power Generator 1) Manufacturer of power generator : Siemens 2) Type of power generator : Horizontal shaft tubular type rotating excitation field three phase current synchronous generator SGen5-100A-2P 080-20 3) Number of phase and poles : 3 phases, 2 poles 4) Rated output at terminal : 11.5 kV, 50Hz 5) Rated current : 1,897 A
LC_Guid: |