Email: [email protected]   WhatsApp/WeChat: +0086-13801218512
  
Homepage   |   Power Generation   |   Top Spare parts   |   spare parts   |   China OEM Equipment and Spare Parts   |   Project Financing    |   Equipments   |   China Small EPC Contractor   |   Transmission   |   Financing-Ebook   |   Contact Us   |   Used Equipment   |   download   |   sitemaps   |   Project-Equipment-Parts-Enquiry   |   供货商Supplier   |   Exchange Link   |   Breaking News  
Mail List

E-mail:

     上方导航  
       Homepage  
       Power Generation  
       Top Spare parts  
       spare parts  
       China OEM Equipment and Spare Parts  
       Project Financing   
       Equipments  
       China Small EPC Contractor  
       Transmission  
       Financing-Ebook  
       Contact Us  
       Used Equipment  
       download  
       sitemaps  
       Project-Equipment-Parts-Enquiry  
       供货商Supplier  
       Exchange Link  
       Breaking News  
     下方导航  

Diesel Generator Proposal

Power Plant Proposal
Required Information for Power Plant Project design and quotation

Home > HomePage > Equipment > Used or Surplus Equipment > MAN - Technical Agreement For 150MVA Double Fuel Power Plant

Buyer     Inquiry Basket     Supplier     Register


Technical Agreement For 150MVA Double Fuel Power Plant


Name of Used or Surplus Equipment/Project:Technical Agreement For 150MVA Double Fuel Power Plant
Brand name of Equipment:MAN
P/N of Equipment:MAN10L32/44
Industry:Fluid Power Generation Industry
Summary Briefs on the equipment:
Origin of Main Product:
Year of Production of Main Equipment:
Current Country located:
Original Packing:
Warranty:
Documents:
Dismantled or on site:
Can be Test Run or Not:
Year of Shutdown:
Year of Overhaul:
Total Operation Hours:
O&M log:
Current Condition:
Dismantling, packing transportation Serviece:
Refurbishment Services:
Site installation and commissioning or Supervision:
Role:
Already Sold or not:
Time of first Sold:
rough budget or contract value in USD:
Payment Terms:
File Link:Technical Agreement For 150MVA 90KV Double Fuel Power Plant 20240218.doc

1.1 GENERAL

�?/span>1�?/span>Power station selection

According to user requirements:

 Middle East climate conditions,150MVA 11/90KV 50HZ  generator set.

Select

7sets MAN10L32/44 HFO generator sets,   5.7MW*7=39.9MW.

23sets CSSC 8M32/42 double fuel generator sets,  3.5MW*23=80.5MW.

total :    30sets generating sets,39.9MW+80.5MW=120.4MW=150.5MVA.

Taking into account the local climate conditions,85% run :150.5*85%=102.34MW.

30sets generating units are connected to the grid.

Total power: 150.5MVA(120.4MW)

Voltage: 11/90kV(with booster transformer)

Frequency: 50Hz

Power factor: 0.8(lag)      

 

1.2 DESIGN CONDITION AND PERFORMANCE DATA

(1) DESIGN AMBIENT CONDITION

Refer to ISO 3046

The standard environmental condition:

Environmental temperature

25�?/span>

Barometric pressure

1bar

RH (relative humidity)

30�?/span>

Gross Output AT Generator   Terminal

150.5MVA

Fuel consumption at   Generator Terminal

Oil:190g/kW.h�?/span>gas 7.5KJ/KWh,tolerance +5%.

Note: Tolerance + 5%, LCV=   42700 kJ/kg, Load 100%, 50 Hz, PF = 0.8

 

 

 

(2) Design condition

Capacity of the genset can be decided under the following design conditions:

Ambient temperature--------------------------------------------10~45�?/span>

Fresh water temperature------------------------------------------36�?/span>

Relative humidity----------------------------------------------------60%

Atmospheric pressure------------------------------------------101.3kPa(760mmHg)

Back pressure of turbo-charger---------------------------350mmAq(max 400mmAq)

Heat exchangers will be designed at fresh water temperature 36�?/span>.

Under the following limiting ambient conditions:

Air temp. at turbocharger inlet           40 deg. C

Water temp. at charge air cooler inlet      30 deg. C

Deration to power applicable for engine    0 %( nil)

Beyond the abovementioned limiting conditions, deration to power as per ISO 3046 will be applicable.

The engine should be capable of accepting a sudden load as per the guidelines in ISO-8528-5-1993(e). As per this standard, the maximum sudden load increase stages are.

           Baseload %     sudden load   increase to %

 --------------------------------------------------------------------------------

1st Stage         0%          40              40%

2nd Stage        40%         30                   70%

3rd Stage        70%         20                90%

4th Stage        90%         10               100%

--------------------------------------------------------------------------------

During each of the above-mentioned stages of sudden loading, the transient speed drop will be restricted to a maximum value of 10% of the rated speed.   

Otherwise, the number of generator sets should be increased.



LC_Guid:
Pubdate: 2024/2/19 9:11:39


Click add item to inquiry basket      Click Copy Shared LinksInquiry Basket

Pageviews: 1



Statement: Any reference to the OEM part number or other OEM information is for the purpose of identification only and does not imply that the part was manufactured by the Original Equipment Manufacturer.

All the brands and trademarks in the whole domain of the website belong to their own owners and does not mean that we are their authorized partner or dealer. All the information in this website is only for reference, we do not assure its accuracy.

This statement supersedes all other claims and statements on all pages, files, pics and information within this whole web domain.

Copyright©2006-2019 Leda Greenpower Beijing ICP Reg. No: 10010978.   Fax:0086-10-84161062  E-mail: [email protected]

JingGongWangAnBei: 11010802035914 Hao