Email: [email protected]   WhatsApp/WeChat: +0086-13801218512
  
Homepage   |   Power Generation   |   Top Spare parts   |   spare parts   |   China OEM Equipment and Spare Parts   |   Project Financing    |   Equipments   |   China Small EPC Contractor   |   Transmission   |   Financing-Ebook   |   Contact Us   |   Used Equipment   |   download   |   sitemaps   |   Project-Equipment-Parts-Enquiry   |   供货商Supplier   |   Exchange Link   |   Breaking News  
Mail List

E-mail:

     上方导航  
       Homepage  
       Power Generation  
       Top Spare parts  
       spare parts  
       China OEM Equipment and Spare Parts  
       Project Financing   
       Equipments  
       China Small EPC Contractor  
       Transmission  
       Financing-Ebook  
       Contact Us  
       Used Equipment  
       download  
       sitemaps  
       Project-Equipment-Parts-Enquiry  
       供货商Supplier  
       Exchange Link  
       Breaking News  
     下方导航  

Diesel Generator Proposal

Power Plant Proposal
Required Information for Power Plant Project design and quotation

Home > HomePage > Equipment > New Equipment > MAN - quotation on HFO power plant MAN 18V32/40 x 3 8730KW HFO Power station MAN 18V32/40

Buyer     Inquiry Basket     Supplier     Register


quotation on HFO power plant MAN 18V32/40 x 3 8730KW HFO Power station MAN 18V32/40


Name of New Equipment:quotation on HFO power plant MAN 18V32/40 x 3 8730KW HFO Power station
Brand name of Equipment:MAN
P/N of Equipment:18V32/40
Industry:Fluid Power Generation Industry
Summary Briefs on the equipment:
Origin of Product:
Original Packing:
Warranty:
Installation, commissioning service:
Role:
Already Sold or not:
Time of first Sold:
Already sold coutry or region:
Rough budget or contract value:  货币选择
Payment Terms:
File Link:NO_File
MAN 18V32/40 x 3 8730KW HFO Power station
1. Main   configuration
The   main parameters:
_ Diesel engine model:MAN 18V32/40
_ Rated power:8,730KW
_ Rated speed:720 rpm
_ Total sets:3
_ Generator voltage:11KV +/- 5%/50Hz
_ Governor:electronic governor
System and   equipment type:
_ Governor:electronic governor
_ Cooling method:water cooling
_ Fuel oil heating heat   source:saturated steam
_ Power station control system:PLC
_ Governor type:electronic speed regulation
• Voltage regulation method:digital AVR
• Fuel fine filter type:self-cleaning
• Lubricating oil fine filter type:self-cleaning
• Oil cooler type:stainless steel plate type
• High temperature water cooler type: stainless steel plate type
_ Fuel heater:lead soldering type
• High   temperature water pump:
System supply, motor driveone pump for one machine
•   Low-temperature water pump:
System supply, motor driveone pump for one machine
•   Lubricating oil pump:
Supplied   with the system, driven by a motor, one pump for one machine






SectionDescriptionQTY
APOWER GENERATION Generating Set :3
A1.1Engine,MAN   Diesel & Turbo, 720 rpm3
A1.1.1Engine   attached lube oil pump(s)
A1.1.2Engine   attached HT cooling water pump
A1.1.3Engine   attached LT cooling water pump
A1.1.4Control   cabinet for turning gear
A1.2Alternator (11 kV +/- 5%, 3 Ph, F/F, IP23, 50 Hz +/- 3%)3
A1.2.1Three   phase synchronous alternator
A1.2.2Automatic   voltage regulator (AVR)
A1.3Flexible   coupling between engine and alternator3
A1.4Foundation   frame seating3
A1.5Foundation   bolts3
BGENSET   MECHANICAL AUXILIARY SYSTEMS
B.1Engine   platform3
B.5Starting   Air System
B5.1Starting   air bottle2
B5.2Starting air compressor module,electric motor driven(duty and   standby)2
B5.3Freezing   dryer2
B5.4Filter2
B.6Control   & Instrument Air System
B6.1Control   air compressor2
B6.2Control air receiver Oil pump room 1PCS Air compressor room   1PCS�?/span>2
B6.3Freezing   dryer2
B6.4Filter2
B.7Service   Air System
B7.1Pressure   Reducing Valve2
B7.2Service   Air Receiver with accessories2
B7.2Service   Compressor2
B.8Cooling   System
B8.1HT   expansion tank3
B8.2LT   expansion tank3
B8.3JW   Preheating unit3
B8.4Nozzle   cooling unit3
B8.5HT   cooling water temperature control valve3
B8.7Cooling   tower3
B8.8Circulating   pump3



QINHUANGDAO BEIFANG MARINE PARTS & MACHINERY IMP&EXP   CO., LTD.



NO.39, QETDZ, Heilongjiang West Rd, Qinhuangdao, Hebei, China



[email protected] - www.BFMP.net - Cell: +86-17621905568



B8.9LT cooling water   temperature control valve3
B8.10LT cooling water temperature control valve for the charge air   cooler DN150, unit outlet LT temperature 49 °C, electronic type3
B8.11LT heat exchanger Low temperature water flow rate 180m3/h3
B8.12HT heat exchanger High temperature water flow rate 108m3/h3
B.9Charge   Air System3
B9.1Intake air filter unit 64t/h, 55400m3/h, maximum pressure drop   20mbar3
B9.2Intake   air expansion joint3
B9.3Intake   air pipe3
B.10Exhaust   Gas System
B10.1Exhaust gas silencer Exhaust flow rate: 116200m3/h, exhaust   temperature: 335 C3
B10.3Exhaust   gas joint3
B10.4Exhaust   gas pipe3
B10.5Exhaust   fork pipe3
B10.6Cheminey3
B.11Steel   Structures for Supports
B11.1Support   for exhaust pipe3
B11.2Support   for intake air silencer3
B11.3Tank   and field area pipeline bracket3
B11.4Maintenance   support for auxiliary module3
B.12Pipes,   valves, clamps, and fittings,supports
CELECTRICAL   AUXILIARY SYSTEMS3
C.1Electro   - Control Package3
C1.1Engine   control pannel3
C1.2Genset   control panel (GCP)3
C1.3Load   conversion system include debugging3
C.2SCADA1
C2.1Central   alarm and monitoring system1
C2.2Printer1
C2.3Control   console 2 Unit1
C2.4Panel1
C.3Main   Switchgear (MV):
C.3.1Generator   breaker3
C.3.2Feeder breaker for auxiliary Transformer Package Include   protection device3
C.3.3Bus   bar measuring cubicle PT Cabin3
C.3.4Outgoing cabinet 13.80 kV Line outgoing cabinet Package Include   Protection Device The quantity will be adjusted according to the owner's   requirements�?/span>3
C.3.5NGT   panel with isolator3
C.3.6MV   cable from alternator terminal box to NGTpane l3
C.3.7MV cable from generator to generator breaker Medium voltage   cable from the unit to the grid connected cabinet (including cold shrink head   )3
C.3.8Cable   trays for the cables,Cable trench bracket3
C.4Station   Service System
C4.1Auxiliary Transformer - Three Phase Oil immerge, Two Windings,   Out door Type & Off Load Tap Changer Introduce a 415V power supply from   the original factory as the starting and backup power supply for this power   station.1
C4.23 Phase & Neutral, 415 V power supply up to station low   voltage distribution Panel for power Plant1
C4.3MCC   for the Pump House equipments supplied1
C4.4Engine   auxiliary panel1
C4.5LV   cabinet1
C4.6LV   Cabinet1
C4.7LV   Cabinet1
C4.8Cable   tray and cable bracket1
C4.9Cable   tube/accessories and installation auxiliary materials1
C4.10Plant-wide fire blocking materials and other installation   materials1
C.5DC System (110 V DC) :- For Balance of Plant & switch yard   110VDC
C5.1Batteries1
C5.2Battery   Charger1
C5.3DC   distribution board1
C5.4Cables1
C.6UPS   System (240 V AC) :UPS
C.61Batteries1
C.62Battery   charger1
C.63AC   distribution board1
C.64Cables1
C.7Measuring   System
C7.1Metering1
C.8Instrumentation   system (Except for oil tanks)
C8.1Auxiliary   system instrument1
C8.2Common   system instrument1
C8.3Panel1
D.1LP STEAM GENERATION SYSTEM FOR Plant Heating system
D.1.1Exhaust   Gas Boiler
D1.1.1Exhaust Gas Boiler Package includes instruments, control   cabinets, and operating flat units3

ACCESSORIES   :
D1.1.23 way motor operated ON/OFF type automatic diverter damper.3
D1.1.3Feed   Water Pump motor assembly (1 W + 1SB)3
D1.1.4Feed   Water Tank3
D1.1.5Chemical   Dosing System3
D1.1.6Blow   down water tank3
D1.2Steam   Header3
D1.3Condensate   recovery tank3
D1.4Condensate   Water Pump module3
FPOWER   PlANT AUXILIARY SYSTEM



F.1.1Plant   HFO sludge system:



F.1.1.2HFO   sludge oil loading pump unit1



F.1.2Treated   Water Tanks



F1.2.2Make   up water pump module (1W+1 SB)1
F.3Training - Number of People: 6 Duration: 30 Days
F3.1Engine   Basic Training Programme
F3.2Genset   Operation and Maintenance Training
G.7Shipping   and Transportation :-
G7.1CIF   shipment for supplied equipment
G7.2Customs   clearance for imported equipment
G7.3Port   charges and all applicable duties
G7.4Inland   transportation to site
G.8Insurance   :
G8.1Equipment transportation insurance Cargo carrier is responsible   for transportation and insurance
G8.2Site   construction engineering insurance



LC_Guid:
Pubdate: 2023/7/14 20:19:57


Click add item to inquiry basket      Click Copy Shared LinksInquiry Basket

Pageviews: 1



Statement: Any reference to the OEM part number or other OEM information is for the purpose of identification only and does not imply that the part was manufactured by the Original Equipment Manufacturer.

All the brands and trademarks in the whole domain of the website belong to their own owners and does not mean that we are their authorized partner or dealer. All the information in this website is only for reference, we do not assure its accuracy.

This statement supersedes all other claims and statements on all pages, files, pics and information within this whole web domain.

Copyright©2006-2019 Leda Greenpower Beijing ICP Reg. No: 10010978.   Fax:0086-10-84161062  E-mail: [email protected]

JingGongWangAnBei: 11010802035914 Hao