INSPECTION AND TESTING      
        
6.1 
Engine testing:       
 The  
engine will be run-in at the test bench at workshop before delivery. Subsequent  
test of 3.5 hours will then be carried out as per following schedule. .   
1/2 Hour at 50   
% COP .    
1/2 Hour at 75   
% COP .    
2   Hours at    
100 % COP .    
1/2 Hour at 110 % COP For  
these tests, engine will be coupled to a hydraulic dynamometer and run on DO as  
fuel. 6.2 Alternator testing: Following  
Routine tests will be conducted on the alternator at workshop. 6.2.1    
For generator armature, generator field, exciter armature and exciter  
field. .   
Measurement of resistance .   
Measurement of insulation resistance .   
High voltage test 6.2.2 
Phase sequence test and voltage balance check. 6.2.3 
Open circuit characteristics With  
generator line voltage recorded against exciter field current. 6.2.4     
Short circuit characteristics With  
generator line current recorded against exciter field current. 6.2.5     
Voltage regulation test Conducted  
with AVR in the circuit with reactive loads. 6.2.6  
Control panel test Standard  
routine tests as per the relevant ISO standard. | 
 ¡¡¡¡¡¡¡¡¡¡ | 
| -------------------------------------------------------------------------------------------
 
 |