BBS  Email&MSN: [email protected]
  
Homepage   |   Power Generation   |   Project Financing    |   Equipments   |   Transmission   |   Financing-Ebook   |   Contact Us   |   Used Equipment   |   download   |   sitemaps   |   Spare Parts   |   BBS-Blog   |   Exclusive-Distributor   |   Exchange Link  

Mail List

E-mail:

Power Generation
     Big Power Plant Projects  
     GE Gas Turbine Power Plant Project  
       3x42mw gas turbine plant proposal  
     15MW Heat recovery plant GE 6B Gas Turbine Plant  
     200mw Coal Fired Plant  
     600mw ultra super critical power plant  
     1500mw GE gas turbine plant  
     3x750mw Gas Turbine Combined Cycle Power Plant  
     360000 M3/D Sea Water Desalination  
     geothermal power plant  
       Work Scope  
       Design Data  
       Steam Turbine  
       Cooling System  
       Water System  
       Ventilation  
       Instrumentation Auto.  
       Electrification  
     Diesel power Plant  
     waste heat recovery power plant  
       4.5MW Waste heat recovery 2500t/d Cement Line  
       7.5MW Waste heat recovery 2x2500t/d Cement Line  
       9MW Waste heat recovery 5000t/d Cement Line  
       18MW Waste heat recovery 2x5000t/d Cement Line  
       Technical Proposal of 9MW Recovery Plant  
       Power Plant Connection and Main Equipments  
       Main Equipment Recovery Plant  
       Power Plant Construction Schedule  
       China Reference List waste heat Plants  
       Preliminary Proposal for Cement Plant  
     Thermal Power proposal  
     Questionnaire for Gas/HFO/Liquid Fuel Power Plant  
     Check-List-for-quotation-on-power-plant  
     Power project reference  
       Thermal plant List  
       Foreign Small plant  
       Reference of Sinomach  
       Diesel generator plant list   
       waste heat recovery power plant list  
       Gas Turbine Power plant Reference  
     Indicative quotation of 2x50MW coal fired plant  
     Estimated Quotation for Plant  
     China large scaled industry power project  
     Biomass-Gasification-Power-Generation-System  
     Gas Engine Generator power plant  
       Proposal quotation of 2x2.6mw gas engine generator  
       500kw-5200kw gas engine generator series  
       500kw-5500kw Gas-Duel fuel diesel Generator  
       well-known-diesel-generator-set-and-Gas-genset  
     Solar-Panel-Power-Plant-Quotation  
     China top conveyor belt for power, mining, port  
     Environment-friendly-solar-power-plant  
     China-the-most-famous-gas-engine-generator-sets  
       Natural-Gas-Genset  
       Biogas-Genset-Landfill-gas-Generator-set  
       Coal-Mine-Gas-Genset  
       Biomass-Genset  
       Coal-Gas-Producer-Gas-Genset  
       Low-BTU-Gas-Genset  
       Gas-Engine  
     3mw-and-4mw-gas-genset-by-CNPC-produce  

Diesel Generator Proposal

Power Plant Proposal

Home > Power Generation - Technical Documents 1x200 MW COAL FIRED POWER PLANT/Ash Handling System


 

Technical Documents 1x200 MW COAL FIRED POWER PLANT/Ash Handling System

 

5  Ash Handling System

5.1 General

5.1.1 Main Date

    a) Coal consumption

              The coal consumption at BMCR  refers to 4.1.1

       b)  Quantity of Fly Ash & Bottom Ash & Mill reject discharged

Note: 1. Fly ash & bottom ash ratio: 90:10

      2. Mill reject data calculated based on 0.7% of Coal consumption

5.2 Design scope of system

5.2.1      Design scope of bottom ash disposal system is from the outlet of boiler to the outlet of dual-axle mixer under bottom ash silo.

5.2.2      Design scope of fly ash conveying system is from the outlet of hoppers of ESP to the outlet of dual-axle mixer and dry ash loader under fly ash silo.

5.2.3      Design scope of pyrite disposal system is from the outlet of mill to truck.

5.3  Description

The Ash handling system consists of fly ash handling system and bottom ash handling system and mill reject handling system.

A dense phase positive pressure pneumatic conveying system will be adopted for fly ash conveying,

A mechanical bottom ash removal system will be adopted for bottom ash handling.

A artificial (simple mechanical ) transfer system will be adopted for mill reject handling.

5.3.1  Fly Ash Handling System

Fly ash in the hoppers of ESP filter will be evenly fed into the vessel and transported to fly ash silo by pneumatic pressure conveying system. One set of pneumatic pressure conveying system will be set for 1×200MW units, which capacity will be 25t/h. That will be in accordance with the 120% quantity of fly ash as firing check coal at BMCR.

Two sets of air compressors and accessories shall be equipped in air compressor for ash conveying system, one operation, one standby. The hoppers of ESP will be equipped with fluidizing plates and heating devices. Two sets of heating device will be set, one operation, one standby.

One fly ash silo will be provided for temporary storage of fly ash. The volume of silo will be 1000m3. which can store more than 40 hours ash of boiler at BMCR with check coal. Fly ash shall be discharged by dry ash loader into tank truck or by dual-axle mixer into trucks, then transported to the ash disposal area or outside. The capacity of these two equipments will be 100t/h. The truck will be provided by owner.

The pressure vacuum valve and bag filter will be installed at the top of ash silo for the gas in ash silo releasing and filtering to keep balance of air pressure inside and outside.

The flow diagram of fly ash system refers to: AF 2009018 -C-01

5.3.2  Bottom Ash Handling System

A dry bottom ash conveyor (steel belt conveying) shall be installed below the outlet of boiler, which capacity is3~12t/h.  Bottom ash fall into a dry chamber, and be conveyed along a slope into the clinker crusher by dry bottom ash conveyor ,then discharge directly to bottom ash silo for storage .

One bottom ash silo with a capacity of 30m3 ,will be provided for one boiler. Bottom ash shall be discharged by dual-axle mixer into truck, then transported to the ash disposal area. Capacity of dual-axle mixers is 40t/h.

The pressure vacuum valve and bag filter will be installed at the top of silo for the gas in ash silo releasing and filtering to keep balance of air pressure inside and outside.

Truck will be provided by owner.

.5.3.3  Mill Reject Handling System

A mill reject hopper will be set under each mill, which volume is 0.8m3. There are five mill rejects hopper for one unit.

Forklift will lift mill reject hopperabout every six hours to truck. One 2 ton forklift and one 10 ton automatic unloading truck will be set, Truck will be provided by owner.

The flow diagram of bottom ash and mill reject disposal system refers to: AF2009018-C-02.