BBS  Email&MSN: ycl1227@163.com
  
Homepage   |   Power Generation   |   Project Financing    |   Equipments   |   Transmission   |   News   |   Contact    |   services   |   download   |   sitemaps   |   Business Opportunity   |   BBS-Blog   |   Purchasing-agent   |   Exchange Link  

Mail List

E-mail:

Power Generation
     Big Power Plant Projects  
     GE Gas Turbine Power Plant Project  
       3x42mw gas turbine plant proposal  
     15MW Heat recovery plant GE 6B Gas Turbine Plant  
     200mw Coal Fired Plant  
     600mw ultra super critical power plant  
     1500mw GE gas turbine plant  
     3x750mw Gas Turbine Combined Cycle Power Plant  
     360000 M3/D Sea Water Desalination  
     geothermal power plant  
       Work Scope  
       Design Data  
       Steam Turbine  
       Cooling System  
       Water System  
       Ventilation  
       Instrumentation Auto.  
       Electrification  
     Diesel power Plant  
     waste heat recovery power plant  
       4.5MW Waste heat recovery 2500t/d Cement Line  
       7.5MW Waste heat recovery 2x2500t/d Cement Line  
       9MW Waste heat recovery 5000t/d Cement Line  
       18MW Waste heat recovery 2x5000t/d Cement Line  
       Technical Proposal of 9MW Recovery Plant  
       Power Plant Connection and Main Equipments  
       Main Equipment Recovery Plant  
       Power Plant Construction Schedule  
       China Reference List waste heat Plants  
       Preliminary Proposal for Cement Plant  
     Thermal Power proposal  
     Questionnaire for Gas/HFO/Liquid Fuel Power Plant  
     Check-List-for-quotation-on-power-plant  
     Power project reference  
       Thermal plant List  
       Foreign Small plant  
       Reference of Sinomach  
       Diesel generator plant list   
       waste heat recovery power plant list  
       Gas Turbine Power plant Reference  
     Indicative quotation of 2x50MW coal fired plant  
     Estimated Quotation for Plant  
     Biomass-Gasification-Power-Generation-System  
     Gas Engine Generator power plant  
       Proposal quotation of 2x2.6mw gas engine generator  
       500kw-5200kw gas engine generator series  
       Hyundai 5.5mw to 9.3mw Gas Engine Generator Sets  
       500kw-5500kw Gas-Duel fuel diesel Generator  
       well-known-diesel-generator-set-and-Gas-genset  
     Solar-Panel-Power-Plant-Quotation  
     China top conveyor belt for power, mining, port  
     Environment-friendly-solar-power-plant  

Diesel Generator Proposal

Power Plant Proposal

Home > Power Generation > Gas Engine Generator power plant > Hyundai 5.5mw to 9.3mw Gas Engine Generator Sets


 

http://www.china-power-contractor.cn//MOU-of-EPC-and-investment-on-25mw-Hyundai-18H35-40GV-gas-engine-generator-power-plant.html

Hyundai gas engine generator technical specification

Model
Capacity of Engine
(kW)
Capacity of Genset of e(kW)
A(m)
B(mm)
C(mm)
W(mm)
H(mm)
Engine Weight in Ton
Genset weight in Ton
ZGPT-12H35/40GV
5760
5587
6624
3760
10384
2650
4723
56
108.8
ZGPT-14H35/40GV
6720
6518
7295
3860
11155
2650
4723
63.3
121.3
ZGPT-16H35/40GV
7680
7449
7914
3479
11393
2650
4723
69.1
130.9
ZGPT-18H35/40GV
8640
8380
8585
3859
12444
2650
4794
76.3
141.2
ZGPT-20H35/40GV
9600
9312
9344
3695
13003
2650
4794
84
153.9

1. The total Genset weigh will change on choice of types of alternators.
2. Drawing of the genset is only for reference.
 
3. gas consumption: 157g/kWh  0.196Nm3/kWh
 
4. The above data is derived from the lowest heat value for liquefied gas of 49138kJ/kg
 

Questions and Answers:

I suggest 16H35/40X4,it’s enough? the engine model that can used see following,
A.    We are agree with 16H35/40GV-50 Hz  x 4 â€?Please send me an offer for thoose .
You mean the exhaust steam from our gas generator? yes, we can offer turbine for you to improve the efficiency.
A.    Exhaust gas from your gas generator. We suppose to produce low pressure steam (about 12 bar, 190 °C) from exhaust heat by using waste heat exchanger and use that steam for power generation by a LP steam turbine. Please send me an offer for a convenient turbine too.
1)Where will be the location of the plant and the project name?
A. City:  East; 40.11 North ; Project name:
2)These power plant will supply power to steel or other metals melting, chemical industry or mains supply for city?
A. Will supply the national grid.
3)This power plant is going to tender from your client or already in your hands?
A. No tender! Already in our hands, but some competitors with prices about 500 $/kW.
4), Is there any other competitors with you? What do you need us to support you to get the order except technical?
A. Yes, Waertsilla, MWM are the main competitors. Not only the investment cost will be determinant, the operating cost is also very important. Please , let me know  the data’s like, NG-consumption per kWh electricity and the total efficiency of the plant for offered gas generators.
Q:We suppose to produce low pressure steam (about 12 bar, 190 °C) from exhaust heat by using waste heat exchanger and use that steam for power generation by a LP steam turbine. Please send me an offer for a convenient turbine too.
A.The steam from exhaust heat by using waste heat exchanger is not enough to drive turbine for power generation, just can be used for heating the mineral oil you have said before.
Q:let me know  the data’s like, NG-consumption per kWh electricity and the total efficiency of the plant for offered gas generators.
A.NG-consumption per kWh electricity is 162g and the Brake Thermal efficiency of the engine is 44.6%
 
   
2MW gas engine generator with cogenerating system

1- what is the efficiency of gas turbine when we use natural gas,

A. The total efficiency of the plant is 49.5%

2- what is the efficiency of gas turbine and cogenerating

A. The steam from exhaust heat by using waste heat exchanger is not enough to drive turbine for power generation

3- please inform me the total natural gas consumption per hour .

A. NG-consumption per kWh electricity is 157g ,so the Total natural gas consumption for 2MW is about 314000g per hour.

4- how many hours you will guarantee it

A. One year after delivery.

5. they are willing to pay 20% of total amount to bank to get loan but it take some time. so if you provide the loan from chinese bank they can visit you and close the deal immediately

A: we need at least 30% of the employer's own financing or equity, among which we can offer 5-10%, you if your employer has 20% of the equity, and then he can let his bank or bank syndicate issue our bank financing guarantee, and buy our Sinosure insurance company premium, it is possible that our bank will offer financing of 70% of the EPC price.

6. PERFORMANCE DATA AT DESIGN AMBIENT CONDITION

- Gross Output AT Generator Terminal : 8381kW/Unit
- Fuel consumption at Generator Terminal : 1,758.0 Nm3/h
(Tolerance +5%, Load 100%, 50 Hz, PF = 0.8
Fuel gas LCV = 49138 kJ/kg, Density = 0.80558 kg/Nm3)
 
But local NG specifications are different
LCV : 8.250 kcal/Nm3
Density: 0,67 kg/Nm3
 
How are than the performance data’s?
A: FUEL GAS FOR GAS ENGINE
For continuous operation without reduction in the rated output, the fuel gas has to fulfill the below mentioned quality requirements.
In order to avoid operation problems like derating, corrosion, wear, lube oil contamination etc. the fuel gas composition must be submitted to the engine manufacturer.
Fuel Gas Specification
-  Lower Calorific Value (LCV)  :        Min. 36 MJ/Nm3
-  Methane Number (MN)        :        Min. 73
-  Particles or solids at engine inlet :     Max. 5 ㎛
-  Particles or solids at engine inlet :        50 mg/Nm3
-  Hydrogen sulphide content (H2S)          :        30 mg/Nm3
-  Gas inlet temperature :        0 - 60 Celsius Degree
 
Technology response for 25MW Gas genset power plant
 
Please specify AVC  report:
1-      Principal maintenance period ( per/h)
Answer: See attached : Maintenance Schedule
2-     semi principal  maintenance period(per/h)
Answer: See attached : Maintenance Schedule
3-     emergency exhaust  (per/h)
Answer: See attached : Maintenance Schedule
4-     services work cost:
Answer: At the present stage, Temporarily unable to provide.
5-     main maintenance cost and its period
Answer: At the present stage, Temporarily unable to provide.
6-     semi  maintenance cost:
Answer: At the present stage, Temporarily unable to provide.
7-     the parts  cost   that will be use in maintenance time:
Answer: At the present stage, Temporarily unable to provide.
8-     total time for exit of work with program :
Answer: we don’t  understand what’s the mean about “total time for exit of work with program â€? Whether refers to the date of delivery. If yes, probably 14-month delivery.
9-     physical life of generator;
Answer: If the normal maintenance and repair, physical life is generally 25 years.
10-   operating cost:
Answer: At the present stage, Temporarily unable to provide.
 
please  specify following items for  CHP report:
1-     source of  heat (exhaust , Jacket, â€?
Answer:
HT-heat dissipation: About 1573kWï¼?/B>
LT-heat dissipation: About 467kWï¼?/B>
Lube Oil                  : About 960kWï¼?/B>
Cylinder Jacket      : About 888kWï¼?/B>
Engine radiation    : About 200kWï¼?/B>
Exhaust gas total  : About 2000kWï¼?/B>
Exhaust gas cooled to 180oC ï¼?/B>About 1072kW;
Exhaust gas cooled to 100oC ï¼?/B>About 1556kW;
2-     account of heat  low quantity  between Energy  provide source  and consumer:
Answer: The recovery boilerï¼?/B>Overheat steam pressure 12.7bar, Overheat steam temperature 305 oC, Overheat steam production 12.5t/h.
3-     thermodynamic heat use :
Answer: N/A
4-     thermodynamic cycle :
5-     account of heat low in to the heat sources and road length transmission of heat
Answer: N/A
6-     the time of heat uses in industrial:
Answer: When the Genset into use,Heat can be used continuously.
7-     heat efficiency  %:
Answer: heat efficiency about 46%
Answer: Electrical efficiency 44.62%
 
on 25mw gas engine generator power plant:
 
1-  In your yesterday letter you said price for EPC USD 900-950 per KW, I talked to client they asked me what do you mean by EPC, as far as I know EPC means that client gives you LAND the rest done by you, you will do engineering, procurement, construction, installation, commissioning, and hand over to customer and you responsible for everything, if my understanding is correct, I think it is negotiable.
A: Yes, you are right;
2-I have sent you name of some engines which is preferred by customer, my question is, are you going to offer with Hyundai engine or you can offer with one of those engines? the reason I ask because customer wants to know what will be the final engine.
A: We will offer with Hyundai engine
2- You mentioned that you produce engine under the license of Hyundai ,would you please clarify if the parts are coming from Hyundai or produces locally.
A: coming from Hyundai
4-I have to know  the name of main components ( such as engine alternator, cooling system , control panels, control system,â€?etc.
A: please check the attached.
5-I requested you to give the price of (not involving in the EPC) power plant CIF Bandar Abbas for 25 MW only per KW.
A: The price of power plant CIF Bandar Abbas that your required scope of supply is $750-800 per KW for 25 MW only(including your commission)
6-In case you do financing we have good chance( in case you do not finance I can do from anther Chines financial institution).
A: yes, we can offer financing solution.
7-I requested you to confirm that I will be your representative in Iran ,please clarify and confirm
A: Yes, we will consider you advice, but the details will be confirmed after we have official meeting
8-Since I gave your price for EPC to customer please consider my commission in your price(seven percent)
A: Yes, we will consider your commission, but the final % will be determined before we sign the contract, because different project have different competitor, we should make sure our quote have strongly competitiveness, however we will ensure the commission within a scope, like 3%-6%
9-Would you please send me your references.
A: I will be offer you later
 
 

b. Gas Fuel consumption  (m3/h): for 15MW in standard atmosphere: 0.196m3/KWHX3X5587KWX1hr=3285 m3/h(0.196 Nm3/KWH, 100%load),  the data is lower than MITSUBISHI 0.213 Nm3/KWH, 100%load, following is the data you offer before.

c.Power efficiency: 44.62%

for 6mw hyundai gas engine generator power project: 

1.Since one 6 Mw genset will not be reliable there for you are kindly requested to consider 3x2 Mw genset and let us have the machines catalogue including preliminary arrangement layout.
A. One genset have lower cost of civil work, maintenance and equipemnt expense, you can also consider choose an diesel generator as emergence generator in case of the gas engine breakdown, after we confirm the configration we will offer you detailed document.
2.Since erection works have included in your scope as per appendix -1 of your proposal therefore your proposed payment condition shall be changed based on each step completion.therefore please let us have a detailed Price breakdown
A. Sorry,
3.pls send us a preliminary Discipline wise working time schedule including man powers and machineries histograms
A. 1 month for installation and 1-2 weeks for commissioning, it's approx 6-7 technicians for this project, and we will take most machine we needed by ourselves.
4.pls let us know how many foreign people will presence in our site during execution of the project.(Man Month)
A.it's approx 6-7 technicians
5.pls let us know accomodation shall be considered by us for how many people including your subcontracors  and vendor representatives.
A. we still need 4-5 local worker for this project,others we will confirm after detail engineering.
6. what do you want for accomodation including facilities and how many people may stay in a house ?
A. It will be confirm when we negotiate the contract.
7.Pls let us know either you will select the iranian subcontractors ?
A. you should find subcontractor for civil work(the house for power plant)
 
For 5mw hfo or gas engine generator plant:
Replied:
1)Are we to understand that Chinese EXIM will give us  ten year credit  for the power plants?
A:Frankly to say, it's hardly to get financing from Chinese Exim bank for this project, you can consider commerical loan, the period and interest rate depend on the guarantee which you can offer, the details should be confirm after negotiation.
2)For the 24  small industrial plants under consideration, we shall start all of them with uniform capacity, better 5-6mw on 50 hz
A:no problem
3)The Hyundai 2750kw; two units to make 5.5mw is good. Kindly confirm whether this is burning diesel or lpfo.
A:both of them, you even can use HFO.
4)What quantity of fuel is it burning per minute?
A:the fuel consumption is normal 180 gram(HFO) per Kwh, so the 6MW power plant will burning 18kg per minute
5)What quantity of fuel per KILOWATT HOUR?
A:180gram(HFO)
6)Can you attach its catalog for me pls?
A:It's too big to send by email.
 
0n 25mw Hyundai gas engine generator power plant 50% investment from our side:
Yesterday (October 18th, 2011) we signed a MOU for 50%:50% investment for a 25mw gas engine generator plant by using our Hyundai 18H35/40GV, and the EPC price is about 25.2 million USD for 3 unit 18H35/40GV of the Hyundai gas engine sets, efficiency of the plant is about 42%. The 18H35/40GV and 16H35/40GV have been listed as approved engines in your MoP in Iran.
So please locate the employers who already got PPA with your government.
 
Yes, the plant can be installed with CHP to increase efficiency too.
 
 

So now you have MOU and you can introduce them for our reference but

limit for efficiency is 45% without CHP, could you confirm?

A: As I have informed you in last mail that our system efficiency is more than 44%.

Why this finance is 50%:50%? Is it means you can not finance up to 85%?

A: yes, we can provide financing up to 85%, against bank guarantee, but to our experience, it is very difficult for financing to private project in Iran due to that they can not provide acceptable bank guarantee.

But if your projects or projects package value is over 100 million USD, and you can provide bank guarantee, then we can talk on EPC and financing through biggest EPC contractor.

Could you say to us step by step what we have to do for financing 25MW gas engine power plant?

A: I mean for 50%:50% investment is that we can invest 50% of the project by supply EPC content to your project, your side provide 50% of the project, so it is investment not financing. we have signed MOU for two projects in such manner, each is 25mw gas engine generator projects. now you first provide PPA copies and also technical documents to us and fill in the attached questionnaire so that we can design and then you are invite to come to Beijing to hold face to face negotiation.

on 15mw gas engine power project:

1. Do you provide all the necessary equipment (generator, accessory etc.) for complete power plant or I have to go to some other vendor also for some other parts?
A:Yes, we will be EPC contractor.
2. We like to do the necessary maintenance by ourselves- do you provide any training?
A:Yes, we will.
3. How many days it may take to go for full production once we have all the equipments?
A:It's approx 12-14 month to COD after we sign contract and advance payment paid to EPC..
4. Can you please, provide me the price list for gas based generator/turbine etc. in US $ for upto 15MW?
A:It's depend on the scope of supply which we confirm final.
5. What is life expectency of the equipments?
A:32000hr for first ouverhaual or 20-25 years.
6. Bangladesh has enough Natural gas resource, I would like to calculate production cost of unit (=1KHr)- is there any help?
A:please tell me the price of Natural gas.
 
on 25mw gas engine generator power project:
I am finalizing the issues by two investor but we shall clarify below mentioned items:
1.The Price $/KW for 15(3x5) Mw & 7(2x3.5) Mw in terms of equipment and complete accessories supply only.
A. it's about $600
2.The Price $/KW for Engineering
A. The price not proportion with power 
3.The Price $/KW for Construction Activities, Pre-Comm & Comm., Start-up, PAC
A. The price not proportion with power  
4.Equipments delivery time.
A.6-8 month 
5.Terms of payments and bank security against down payment.
A. it's normal 30% advance payment against bank guarantee ,60% LC at signt against shipment document, 10% after commissioning
5.Your Investment situation and conditions.
A.specific project specific analysis, which need negotiated with you base on project background
 
Please provide us below information for 5MW power plant and 220MW power plant separately :
1)Estimated amount of the internal purchasing and buildings and facilities and equipments contribution and value in entire of the project:
A:5MW: the main generator is about 35%,buildings and facalities is about 20%, other equipment is about 40%
220MW:the main generator is about 40%,buildings and facalities is about 15%, other equipment is about 35%  


2)Estimated amount of the management and project engineering contribution and value in entire of the project
:
A: the management is about 0.01usd per kwh.
3)Brand, model and price of equipments and generators required for the plant which you will import for the project:
A:HYUNDAI 12H35/40GV or18H35/40GV

4)Your guidelines and necessary warranties for implementing the project and continue to the project[What solutions and what guaranty you Suggest for continue and do the project]
:
A: We will open bank guarantee against to  your each payment.

5)How is your partnership method in the project( about the joint venture and other matters )
:
A:We  will be JV member and EPC contractor and leda greenpower will be project consultant. 

6)The gas generators and equipments which you will import for this project will include how much of the project and your investment's percent:
A: I think it's about 55%-70% of the project.


- Hyundai gas engine generator set quotation 24/1 2011
- Quotation and supply scope of 5x5760kw 12H35/40GV Hyundai gas engine power plant 26/11 2010
- Quotation and supply scope of3x5760kw 12H35/40GV Hyundai gas engine power plant 25/11 2010
- The manufacturers of 5x5587 KW 12H35/40GV gas engine Project 3/11 2010
- TECHNICAL SPECIFICATION FOR NIGERIA 14MW GAS POWER PLANT (12H35/40GV X 3 SET(s)) 3/11 2010
- 16H35/40GV2x7.5mw Hyundai gas engine generator power plant supply scope. 28/10 2010
- 5x5.5mw Hyundai 12H35/40GV gas engine generator power plant supply scope. 26/10 2010