BBS  Email&MSN: ycl1227@163.com
  
Homepage   |   Power Generation   |   Project Financing    |   Equipments   |   Transmission   |   News   |   Contact    |   services   |   download   |   sitemaps   |   Business Opportunity   |   BBS-Blog   |   Purchasing-agent   |   Exchange Link  

Mail List

E-mail:

Power Generation
     Big Power Plant Projects  
     GE Gas Turbine Power Plant Project  
       3x42mw gas turbine plant proposal  
     15MW Heat recovery plant GE 6B Gas Turbine Plant  
     200mw Coal Fired Plant  
     600mw ultra super critical power plant  
     1500mw GE gas turbine plant  
     3x750mw Gas Turbine Combined Cycle Power Plant  
     360000 M3/D Sea Water Desalination  
     geothermal power plant  
       Work Scope  
       Design Data  
       Steam Turbine  
       Cooling System  
       Water System  
       Ventilation  
       Instrumentation Auto.  
       Electrification  
     Diesel power Plant  
     waste heat recovery power plant  
       4.5MW Waste heat recovery 2500t/d Cement Line  
       7.5MW Waste heat recovery 2x2500t/d Cement Line  
       9MW Waste heat recovery 5000t/d Cement Line  
       18MW Waste heat recovery 2x5000t/d Cement Line  
       Technical Proposal of 9MW Recovery Plant  
       Power Plant Connection and Main Equipments  
       Main Equipment Recovery Plant  
       Power Plant Construction Schedule  
       China Reference List waste heat Plants  
       Preliminary Proposal for Cement Plant  
     Thermal Power proposal  
     Questionnaire for Gas/HFO/Liquid Fuel Power Plant  
     Check-List-for-quotation-on-power-plant  
     Power project reference  
       Thermal plant List  
       Foreign Small plant  
       Reference of Sinomach  
       Diesel generator plant list   
       waste heat recovery power plant list  
       Gas Turbine Power plant Reference  
     Indicative quotation of 2x50MW coal fired plant  
     Estimated Quotation for Plant  
     Biomass-Gasification-Power-Generation-System  
     Gas Engine Generator power plant  
       Proposal quotation of 2x2.6mw gas engine generator  
       500kw-5200kw gas engine generator series  
       Hynudai 5.5mw to 9.3mw Gas Engine Generator Sets  
       500kw-5500kw Gas-Duel fuel diesel Generator  
     Solar-Panel-Power-Plant-Quotation  
     Power Plant Auxiliary  

Diesel Generator Proposal

Power Plant Proposal

Home > Power Generation > Gas Engine Generator power plant > Hynudai 5.5mw to 9.3mw Gas Engine Generator Sets


 

Hyundai gas engine generator technical specification

Model
Capacity of Engine
(kW)
Capacity of Genset of e(kW)
A(m)
B(mm)
C(mm)
W(mm)
H(mm)
Engine Weight in Ton
Genset weight in Ton
ZGPT-12H35/40GV
5760
5587
6624
3760
10384
2650
4723
56
108.8
ZGPT-14H35/40GV
6720
6518
7295
3860
11155
2650
4723
63.3
121.3
ZGPT-16H35/40GV
7680
7449
7914
3479
11393
2650
4723
69.1
130.9
ZGPT-18H35/40GV
8640
8380
8585
3859
12444
2650
4794
76.3
141.2
ZGPT-20H35/40GV
9600
9312
9344
3695
13003
2650
4794
84
153.9

1. The total Genset weigh will change on choice of types of alternators.
2. Drawing of the genset is only for reference.
 
3. gas consumption: 157g/kWh  0.196Nm3/kWh
 
4. The above data is derived from the lowest heat value for liquefied gas of 49138kJ/kg
 

Questions and Answers:

I suggest 16H35/40X4,it’s enough? the engine model that can used see following,
A.    We are agree with 16H35/40GV-50 Hz  x 4 â€?Please send me an offer for thoose .
You mean the exhaust steam from our gas generator? yes, we can offer turbine for you to improve the efficiency.
A.    Exhaust gas from your gas generator. We suppose to produce low pressure steam (about 12 bar, 190 °C) from exhaust heat by using waste heat exchanger and use that steam for power generation by a LP steam turbine. Please send me an offer for a convenient turbine too.
1)Where will be the location of the plant and the project name?
A. City:  East; 40.11 North ; Project name:
2)These power plant will supply power to steel or other metals melting, chemical industry or mains supply for city?
A. Will supply the national grid.
3)This power plant is going to tender from your client or already in your hands?
A. No tender! Already in our hands, but some competitors with prices about 500 $/kW.
4), Is there any other competitors with you? What do you need us to support you to get the order except technical?
A. Yes, Waertsilla, MWM are the main competitors. Not only the investment cost will be determinant, the operating cost is also very important. Please , let me know  the data’s like, NG-consumption per kWh electricity and the total efficiency of the plant for offered gas generators.
Q:We suppose to produce low pressure steam (about 12 bar, 190 °C) from exhaust heat by using waste heat exchanger and use that steam for power generation by a LP steam turbine. Please send me an offer for a convenient turbine too.
A.The steam from exhaust heat by using waste heat exchanger is not enough to drive turbine for power generation, just can be used for heating the mineral oil you have said before.
Q:let me know  the data’s like, NG-consumption per kWh electricity and the total efficiency of the plant for offered gas generators.
A.NG-consumption per kWh electricity is 162g and the Brake Thermal efficiency of the engine is 44.6%
 
   
2MW gas engine generator with cogenerating system

1- what is the efficiency of gas turbine when we use natural gas,

A. The total efficiency of the plant is 49.5%

2- what is the efficiency of gas turbine and cogenerating

A. The steam from exhaust heat by using waste heat exchanger is not enough to drive turbine for power generation

3- please inform me the total natural gas consumption per hour .

A. NG-consumption per kWh electricity is 157g ,so the Total natural gas consumption for 2MW is about 314000g per hour.

4- how many hours you will guarantee it

A. One year after delivery.

5. they are willing to pay 20% of total amount to bank to get loan but it take some time. so if you provide the loan from chinese bank they can visit you and close the deal immediately

A: we need at least 30% of the employer's own financing or equity, among which we can offer 5-10%, you if your employer has 20% of the equity, and then he can let his bank or bank syndicate issue our bank financing guarantee, and buy our Sinosure insurance company premium, it is possible that our bank will offer financing of 70% of the EPC price.

6. PERFORMANCE DATA AT DESIGN AMBIENT CONDITION

- Gross Output AT Generator Terminal : 8381kW/Unit
- Fuel consumption at Generator Terminal : 1,758.0 Nm3/h
(Tolerance +5%, Load 100%, 50 Hz, PF = 0.8
Fuel gas LCV = 49138 kJ/kg, Density = 0.80558 kg/Nm3)
 
But local NG specifications are different
LCV : 8.250 kcal/Nm3
Density: 0,67 kg/Nm3
 
How are than the performance data’s?
A: FUEL GAS FOR GAS ENGINE
For continuous operation without reduction in the rated output, the fuel gas has to fulfill the below mentioned quality requirements.
In order to avoid operation problems like derating, corrosion, wear, lube oil contamination etc. the fuel gas composition must be submitted to the engine manufacturer.
Fuel Gas Specification
-  Lower Calorific Value (LCV)  :        Min. 36 MJ/Nm3
-  Methane Number (MN)        :        Min. 73
-  Particles or solids at engine inlet :     Max. 5 ㎛
-  Particles or solids at engine inlet :        50 mg/Nm3
-  Hydrogen sulphide content (H2S)          :        30 mg/Nm3
-  Gas inlet temperature :        0 - 60 Celsius Degree

 


- 16H35/40GV2x7.5mw Hyundai gas engine generator power plant supply scope. 28/10 2010
- 5x5.5mw Hyundai 12H35/40GV gas engine generator power plant supply scope. 26/10 2010

Total 1 pages 2 items, Now at 1 page. First. Last. Next End


Copyright©2006-2010 Leda Greenpoweer Beijing ICP Reg. No: 10010978
   Fax:0086-10-84568952  E-mail:
ycl1227@163.com