BBS  Email&MSN: [email protected]
  
Homepage   |   Power Generation   |   Project Financing    |   Equipments   |   Transmission   |   News   |   Contact    |   services   |   download   |   sitemaps   |   Business Opportunity   |   BBS-Blog   |   Purchasing-agent   |   Exchange Link  

Mail List

E-mail:

Home > Project Financing  - Fruitful visit to Africa with billions of USD intented power projects


 

Fruitful visit to Africa with billions of USD intented power projects

Dear Sirs,

This is the maillist from Yang chunlin, to inform you that we have returned from our trip to Africa with our
No:. Chinese power EPC contractor of CMEC. This trip brought us a lot of power generation and transmission
projects as EPC and financing arranger from our Eximbank. Total amount of these intented projects are valued
at more them 2 billion USD. We will offer technical and financial proposals to the employer as exclusive EPC.


Now it is high time for Chinese EPC contractors to submit projects under negotiation with foreign employer
for EPC contracting and applying China’s Eximbank soft loan or commercial loans for the period of 2010
or 2011. We have already shortlisted your projects into our format which is to be reported to our
Ministry of Commerce, Ministry of Finance and Eximbank. But apart from the name of these projects,
these government departments need documents to prove to them that these projects are ready and serious
for both Chinese EPC and foreign employers, and foreign governments, esp. these applying soft loans from
Exim bank.
We need these documents in the following steps:
1.       Projects feasibility study or technical/commercial requirements;
2.       Letter of Intent from the foreign employers, government agents or Ministry of Power/Electricity
or respective industrial Ministries;
3.       EPC contracts with Chinese EPC contractors, such as our company;
4.       Letter of Intent for applying soft loan or commercial loan with sovereign guarantee, signed by
Minister of Finance representing the Federal government;
5.       Environment impact Assessment for the projects verified by EPA of Federal government;
6.       Documents  proving that the financing of at least 15% of EPC contract value is ready and will
be paid to EPC from employer’s contribution;
7.       Employer’s official name, address, brief introduction, financial statements for the last
three years.
 
So please expedite every processes to report projects brief to us so that we can start to work on them.
 
In order to help foreign employers or agents to unerstand the steps on how to work with our famous EPC contractor
and process on steps of applying both soft loan or commercial loan against guaratnee, our partner of Leda
Greenpower edited an English book on these steps: http://www.china-power-contractor.cn/Government-finance.html


With My Best Regards,
 
yang chun lin
 
Project Manager
 
China National Electric Wire & Cable Imp./Exp. Corp.
CMEC
http://www.china-power-contractor.cn

Email:[email protected]

Tel: 0086 10 85805516

Fax: 0086 10-84568952

Mobile: 0086 13801218512

D-803, Shengshijiayuan, Road 98, Jianguo, Beijing 100022, China





Copyright©2006-2010 Leda Greenpoweer Beijing
   Fax:0086-10-84568952  E-mail:
[email protected]